Design and make of sports obstacles

14 November 2023

REQUEST FOR QUOTATION

 

Quotations are hereby invited from service providers for Design and make of sports obstacles for Business studies campus. Project includes construction of concreate bridge, site clearing and ground levelling and pavement around the obstacles. 

Re-Advert: WTC- BSC/DMS/11/2023- Design and make of sports obstacles for Business studies campus. Project includes construction of concreate bridge, site clearing and ground levelling and pavement around the obstacles.

Quotations displaying quotation number WTC- BSC/DMS/11/2023 must be submitted on/or before the closing time

Closing date                               : 22/11/2023

Closing time                              : 14H00 pm

Validity Period of Tender          : 90 days

Compulsory briefing session             : 17/11/2023 at 10:00 am

Address                                               : Business Studies Campus

                                                            Cnr Leseding & Technical street

                                                            Mahwelereng -A

                                                            Mokopane

                                                            0626 

 

All enquiries related to this RFQ may be addressed to this email: scm@waterbergcollege.co.za

NB: This email is for enquiries only, please submit your quotation on the below email    

 

The following documents must accompany your quotation

·       Copy of CK certificate must be attached indicating member's names and percentage ownership within the enterprise,

·       Valid tax compliant letter with PIN

·       BBBEE Certificate/ A sworn affidavit

·       Completed and signed SBD 6.1: Preference point claim form in terms of the preferential Procurement Regulation 2022

·       Completed and signed SBD 4: Declaration of interest

·       Proof of CSD registration Report

·       Proof of experience of similar projects completed (Attach at least two testimonial letters) Projects to be physically verified.


Waterberg TVET College promotes fair competition among suppliers. Any form of bid-rigging or collusive bidding will be unacceptable. Bidders will be disqualified.

Suppliers must submit their quotations and all attachments to Waterberg TVET College Central office at Cnr Hooge & Totius streets, Chroompark, 0600 or can alternatively be sent by email to: rfq@waterbergcollege.co.za

Waterberg TVET College does not bind itself to accept the lowest or any quotation. The right is reserved to accept any tender in whole or in part and re-advertise this quotation any time after the closing date.


SPECIFICATION

DESIGN AND MAKE OF SPORTS OBSTACES FOR BUSINESS STUDIES CAMPUS. Project includes construction of concreate bridge, site clearing and ground levelling and pavement around the obstacles.

 

DETAILED SPECIFICATION OF EACH OBSTACLE IS ATTACHED

 

 

No.

Item Description

Quantities

Unit price

Total

1.      

Construction of concrete bridge

Construct a 3mx3m concrete bridge over a drain water tunnel.

1

 

 

2.      

Ground levelling 

Remove and dispose of all the rubble on the surface and level the ground. Remove the old water dam and dispose all material.

1

 

 

3.      

Paving

200x100x60mm Precast concrete interlocking paving

1

 

 

Sports Obstacles

 

Total area space for all obstacles is 72m x 24m

4.      

The tyre resistance (1m wide,1,4m high and 8m long)

1

 

 

5.      

The high -low bars obstacle (1,3m in height) and two low bars (each 60cm high)

1

 

 

6.      

The hang ladder obstacle (2,5m high, 50cm wide and 6m long) 

1

 

 

7.      

The tower obstacle (5m high, 2.5m wide and 2.5m long)

1

 

 

8.      

The mid-bars obstacles (1.3m high, 2m wide and 9m long)

1

 

 

9.      

The assisted wall obstacle (1.8m high and 2.5 m wide)

1

 

 

10.   

The raised balancing beam obstacle (1m high, 15cm width and 3m length)

1

 

 

11.   

The Jacob ladder obstacle (5m high, 2m wide and 8m long) the pole along which one walks is 2.5m above the ground

1

 

 

12.   

The tunnel obstacle (radius of the tunnel 80-100cm and 10cm length)

1

 

 

13.   

The leopard crawl obstacles (50cm high, 2m width and 5m long)

1

 

 

 

 

 

Subtotal

R

 

 

 

VAT @ 15%

R

 

 

 

Grand Total

R

              

Please note: Suppliers must use the above format on their quotation.